{"product_id":"snb10d-225-cu2t-yokogawa-prosafe-rs-safety-node-unit-sis-module","title":"SNB10D-225\/CU2T YOKOGAWA ProSafe-RS Safety Node Unit SIS Module","description":"\u003ch2\u003eYOKOGAWA SNB10D-225\/CU2T Safety Node Unit\u003c\/h2\u003e\n\u003cp\u003eThe \u003cstrong\u003eYOKOGAWA SNB10D-225\/CU2T\u003c\/strong\u003e, also cataloged as the \u003cstrong\u003eSNB10D\u003c\/strong\u003e Safety Node Unit, operates as a dedicated hardware component for SIL3-compliant signal processing and I\/O management within ProSafe-RS Safety Instrumented System (SIS) platforms.\u003c\/p\u003e\n\u003ch3\u003eSuffix Breakdown \u0026amp; Model Matrix\u003c\/h3\u003e\n\u003cfigure class=\"table\"\u003e\n\u003ctable\u003e\n\u003cthead\u003e\n\u003ctr\u003e\n\u003cth\u003e\u003cstrong\u003eSuffix Code\u003c\/strong\u003e\u003c\/th\u003e\n\u003cth\u003e\u003cstrong\u003eDescription\u003c\/strong\u003e\u003c\/th\u003e\n\u003c\/tr\u003e\n\u003c\/thead\u003e\n\u003ctbody\u003e\n\u003ctr\u003e\n\u003ctd\u003eSNB10D\u003c\/td\u003e\n\u003ctd\u003eSafety Node Unit (Rack Mountable)\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003ctr\u003e\n\u003ctd\u003e-2\u003c\/td\u003e\n\u003ctd\u003eDual-redundant power supply with node expansion license\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003ctr\u003e\n\u003ctd\u003e225\u003c\/td\u003e\n\u003ctd\u003e220 to 240 V AC power supply\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003ctr\u003e\n\u003ctd\u003e\/CU2T\u003c\/td\u003e\n\u003ctd\u003eConnector Unit with Terminator for ESB Bus\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003c\/tbody\u003e\n\u003c\/table\u003e\n\u003c\/figure\u003e\n\u003ch3\u003eHardware Specifications\u003c\/h3\u003e\n\u003cfigure class=\"table\"\u003e\n\u003ctable\u003e\n\u003cthead\u003e\n\u003ctr\u003e\n\u003cth\u003e\u003cstrong\u003eParameter\u003c\/strong\u003e\u003c\/th\u003e\n\u003cth\u003e\u003cstrong\u003eSpecification\u003c\/strong\u003e\u003c\/th\u003e\n\u003c\/tr\u003e\n\u003c\/thead\u003e\n\u003ctbody\u003e\n\u003ctr\u003e\n\u003ctd\u003eModel\u003c\/td\u003e\n\u003ctd\u003eSNB10D-225\/CU2T\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003ctr\u003e\n\u003ctd\u003eBrand\u003c\/td\u003e\n\u003ctd\u003eYOKOGAWA\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003ctr\u003e\n\u003ctd\u003eOrigin\u003c\/td\u003e\n\u003ctd\u003eJapan\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003ctr\u003e\n\u003ctd\u003eWeight\u003c\/td\u003e\n\u003ctd\u003e5.9 kg\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003ctr\u003e\n\u003ctd\u003eDimensions\u003c\/td\u003e\n\u003ctd\u003e482.6 mm x 221.5 mm x 205 mm\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003ctr\u003e\n\u003ctd\u003eOperating Temp\u003c\/td\u003e\n\u003ctd\u003e-20 deg C to 70 deg C\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003ctr\u003e\n\u003ctd\u003ePower Consumption\u003c\/td\u003e\n\u003ctd\u003e230 VA\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003ctr\u003e\n\u003ctd\u003eSafety Level\u003c\/td\u003e\n\u003ctd\u003eSIL3 (IEC 61508)\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003c\/tbody\u003e\n\u003c\/table\u003e\n\u003c\/figure\u003e\n\u003ch3\u003eProSafe-RS SIS Safety Execution\u003c\/h3\u003e\n\u003cp\u003eThe SNB10D-225\/CU2T facilitates fail-safe state execution within safety-critical control loops. The unit architecture employs triple modular redundancy (TMR) 2oo3 principles at the system level to ensure that no single-point hardware failure results in an unsafe process condition. Galvanic isolation is maintained across all I\/O interfaces to protect the safety controller from transient surges and ground-induced potential differences. By enforcing strict separation between safety-critical logic and process control networks, the node ensures that the safety interlock functions remain deterministic and independent, satisfying the rigorous diagnostic coverage requirements mandated by SIL3 certification.\u003c\/p\u003e\n\u003ch3\u003eFrequently Asked Questions\u003c\/h3\u003e\n\u003cp\u003eQ: Can the SNB10D-225\/CU2T be configured for non-redundant power input?\u003c\/p\u003e\n\u003cp\u003eA: The hardware is specifically engineered with a dual-redundant power supply architecture. While it may operate with a single source, optimal safety and availability metrics are predicated on dual-fed power inputs to prevent shutdowns during a primary power failure.\u003c\/p\u003e\n\u003cp\u003eQ: What are the primary diagnostic limitations when using the ESB bus terminator?\u003c\/p\u003e\n\u003cp\u003eA: The \/CU2T connector unit provides passive termination to maintain bus impedance. If the ESB bus exhibits reflection errors or cyclic redundancy check (CRC) faults, verify the termination jumper settings and physical cable integrity before inspecting the node backplane.\u003c\/p\u003e\n\u003ch3\u003eField Installation Guidelines\u003c\/h3\u003e\n\u003col\u003e\n\u003cli\u003eInstall the unit in a standard 19-inch cabinet, ensuring the environmental conditions do not exceed the ISA G3 corrosive resistance standards.\u003c\/li\u003e\n\u003cli\u003eConnect the optical ESB bus cables (ANT401) to the designated ports, ensuring the bend radius of the fiber-optic cabling is not violated to prevent attenuation.\u003c\/li\u003e\n\u003cli\u003eTerminate dual 220-240 V AC power inputs to the redundant terminals, ensuring each circuit is protected by an independent breaker.\u003c\/li\u003e\n\u003cli\u003eVerify the ground connection on the chassis to the cabinet earth stud using low-impedance cabling to ensure effective shielding against electromagnetic noise.\u003c\/li\u003e\n\u003cli\u003ePerform an initial system handshake via the ProSafe-RS engineering software to confirm the node expansion license is recognized and the bus communication is established.\u003c\/li\u003e\n\u003c\/ol\u003e","brand":"Yokogawa","offers":[{"title":"Default Title","offer_id":43572336590938,"sku":"SNB10D-225\/CU2T","price":99.0,"currency_code":"USD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0710\/5957\/0778\/files\/410_f57380ce-c82a-45cd-a99c-bf07e4c8ba05.jpg?v=1782785427","url":"https:\/\/www.spareoil.com\/ar\/products\/snb10d-225-cu2t-yokogawa-prosafe-rs-safety-node-unit-sis-module","provider":"SpareOil Automation","version":"1.0","type":"link"}