{"product_id":"general-electric-ds200tcpdg1b-mark-v-power-distribution-board","title":"General Electric DS200TCPDG1B Mark V Power Distribution Board","description":"\u003cp\u003eThe \u003cstrong\u003eGeneral Electric DS200TCPDG1B\u003c\/strong\u003e, also cataloged as the \u003cstrong\u003eDS200TCPD\u003c\/strong\u003e Power Distribution Module, operates as a dedicated hardware component for primary power distribution and circuit fuse monitoring within Mark V Turbine Control System platforms.\u003c\/p\u003e\n\u003ch3\u003eHardware Specifications\u003c\/h3\u003e\n\u003cfigure class=\"table\"\u003e\n\u003ctable\u003e\n\u003cthead\u003e\n\u003ctr\u003e\n\u003cth\u003e\u003cstrong\u003eParameter\u003c\/strong\u003e\u003c\/th\u003e\n\u003cth\u003e\u003cstrong\u003eSpecification\u003c\/strong\u003e\u003c\/th\u003e\n\u003c\/tr\u003e\n\u003c\/thead\u003e\n\u003ctbody\u003e\n\u003ctr\u003e\n\u003ctd\u003e\u003cstrong\u003eModel\u003c\/strong\u003e\u003c\/td\u003e\n\u003ctd\u003eDS200TCPDG1B\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003ctr\u003e\n\u003ctd\u003e\u003cstrong\u003eBrand\u003c\/strong\u003e\u003c\/td\u003e\n\u003ctd\u003eGeneral Electric\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003ctr\u003e\n\u003ctd\u003e\u003cstrong\u003eOrigin\u003c\/strong\u003e\u003c\/td\u003e\n\u003ctd\u003eUSA\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003ctr\u003e\n\u003ctd\u003e\u003cstrong\u003eWeight\u003c\/strong\u003e\u003c\/td\u003e\n\u003ctd\u003eStandard PCB weight (~0.60 kg \/ 1.3 lbs)\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003ctr\u003e\n\u003ctd\u003e\u003cstrong\u003eDimensions\u003c\/strong\u003e\u003c\/td\u003e\n\u003ctd\u003eStandard Mark V full-height board profile\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003ctr\u003e\n\u003ctd\u003e\u003cstrong\u003eOperating Temp\u003c\/strong\u003e\u003c\/td\u003e\n\u003ctd\u003e0 to 60 deg C\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003ctr\u003e\n\u003ctd\u003e\u003cstrong\u003ePower Consumption\u003c\/strong\u003e\u003c\/td\u003e\n\u003ctd\u003eBus input scaled per terminal configuration\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003ctr\u003e\n\u003ctd\u003e\u003cstrong\u003eSeries\u003c\/strong\u003e\u003c\/td\u003e\n\u003ctd\u003eMark V\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003ctr\u003e\n\u003ctd\u003e\u003cstrong\u003eFunctional Acronym\u003c\/strong\u003e\u003c\/td\u003e\n\u003ctd\u003eTCPD\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003ctr\u003e\n\u003ctd\u003e\u003cstrong\u003eFunctional Revision\u003c\/strong\u003e\u003c\/td\u003e\n\u003ctd\u003eRevision B\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003ctr\u003e\n\u003ctd\u003e\u003cstrong\u003ePCB Coating\u003c\/strong\u003e\u003c\/td\u003e\n\u003ctd\u003eNormal Coating\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003ctr\u003e\n\u003ctd\u003e\u003cstrong\u003eFuse Assembly\u003c\/strong\u003e\u003c\/td\u003e\n\u003ctd\u003e36 individual fuses (Designated FU1 through FU36)\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003ctr\u003e\n\u003ctd\u003e\u003cstrong\u003eStatus Indicators\u003c\/strong\u003e\u003c\/td\u003e\n\u003ctd\u003e36 Green OK LEDs (fuse status), 2 Red System Fault LEDs\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003ctr\u003e\n\u003ctd\u003e\u003cstrong\u003eSwitching \u0026amp; Jumpers\u003c\/strong\u003e\u003c\/td\u003e\n\u003ctd\u003e8 Toggle switches (SW1-SW8), BJS ground reference isolation jumper\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003ctr\u003e\n\u003ctd\u003e\u003cstrong\u003eTerminals \u0026amp; Connectors\u003c\/strong\u003e\u003c\/td\u003e\n\u003ctd\u003e4 Screw signal wire terminals, 1 10-pin header connector\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003c\/tbody\u003e\n\u003c\/table\u003e\n\u003c\/figure\u003e\n\u003ch3\u003eFirmware Flash \u0026amp; Power Bus Integration\u003c\/h3\u003e\n\u003cp\u003eConfigured to distribute operational DC and AC power throughout the turbine rack, the module relies on high-efficiency firmware flash compatibility across adjacent control boards to process status signals. Input power conversion is conditioned via an auxiliary DACA power unit. The internal power traces maintain strict isolation while interfacing with the backplane logic, ensuring that high-density power delivery does not induce noise or compromise deterministic backplane communication velocity across the Speedtronic system architecture.\u003c\/p\u003e\n\u003ch3\u003eFrequently Asked Questions\u003c\/h3\u003e\n\u003cp\u003e\u003cstrong\u003eQ: How do the individual status LEDs indicate a blown fuse on the DS200TCPDG1B?\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eA: Each of the 36 fuse positions features a dedicated OK LED. An illuminated LED indicates that the fuse is healthy and operational, while an extinguished LED signifies a blown fuse requiring replacement.\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eQ: What is the function of the onboard BJS hardware jumper?\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eA: The BJS jumper selects ground reference isolation for automated drive assembly systems utilizing an external reference, providing a clean ground tie when enabled.\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eQ: What tools are required to secure field signal wiring to the power distribution board?\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eA: Standard copper signal wires connect directly to the four screw terminals using a slotted screwdriver to torque or release the retention clamp.\u003c\/strong\u003e\u003c\/p\u003e\n\u003ch3\u003eField Installation Guidelines\u003c\/h3\u003e\n\u003col\u003e\n\u003cli\u003e\n\u003cstrong\u003ePower Isolation:\u003c\/strong\u003e De-energize all primary supply lines fed into the distribution board before attempting installation, removal, or fuse replacement.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eStatic Precaution:\u003c\/strong\u003e Wear a grounded ESD wrist strap before handling the PCB assembly to prevent damage to sensitive surface-mount components.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eMounting:\u003c\/strong\u003e Carefully position the board onto its mounting standoffs inside the Mark V rack enclosure, ensuring all support points line up cleanly.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eWiring Termination:\u003c\/strong\u003e Strip signal wire leads cleanly, insert the bare copper end fully into the corresponding terminal block, and firmly tighten the terminal retention screw.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eJumper Setting Verification:\u003c\/strong\u003e Ensure the BJS ground reference jumper matches the exact electrical grounding requirements of the specific control drive configuration prior to re-applying power.\u003c\/li\u003e\n\u003c\/ol\u003e","brand":"General Electric","offers":[{"title":"Default Title","offer_id":43904462028890,"sku":"DS200TCPDG1B","price":99.0,"currency_code":"USD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0710\/5957\/0778\/files\/DS200TCPDG1B.png?v=1787649557","url":"https:\/\/www.spareoil.com\/products\/general-electric-ds200tcpdg1b-mark-v-power-distribution-board","provider":"SpareOil Automation","version":"1.0","type":"link"}