Configured for high-speed deterministic I/O data acquisition in CENTUM VP control systems, the Yokogawa ANB10D-425/CU2N (ANB10D Node Unit) provides direct electrical interface and power distribution for field-mounted I/O modules via the ESB bus network.
The ANB10D-425/CU2N utilizes specific suffix and option codes to define communication interfaces, power input requirements, and license capabilities.
| Model Suffix | Specification Details |
|---|---|
| ANB10D | Node Unit for Dual-Redundant ESB Bus |
| -4 | Dual-redundant power supply configuration |
| 2 | 220-240 VAC power supply input |
| 5 | Basic type (no explosion protection) |
| /CU2N | Includes Connector Unit for ESB Bus (S9562FA) |
| /NDEL | Software License for Node Expansion |
| Parameter | Specification |
|---|---|
| Model | ANB10D-425/CU2N |
| Brand | Yokogawa |
| Origin | Singapore |
| Weight | 10.0 kg |
| Dimensions | 350 x 260 x 180 mm |
| Operating Temp | 0 deg C to +55 deg C |
| Power Consumption | Dependent on I/O load |
| Bus Type | ESB (Ethernet-based Serial Bus) |
The ANB10D-425/CU2N facilitates process control by serving as the primary node interface for FIO I/O modules. It manages 4-20 mA HART loop protocol communications, ensuring high-fidelity signal transmission to the Field Control Unit (FCU). The hardware utilizes channel-to-channel isolation to prevent ground loops and electrical interference between disparate field devices. Furthermore, the unit incorporates cold junction compensation (CJC) capabilities for thermocouple inputs, providing accurate thermal measurement data to the control processor. The internal bus architecture supports redundant communication paths, ensuring that a single-point failure in the ESB cabling does not result in the loss of I/O control.
Q: Does the ANB10D-425/CU2N support hot-swap replacement of I/O modules?
A: Yes, the unit allows for the hot-swap of I/O modules during operation. Ensure that the module is fully seated and the connector latches are engaged to maintain electrical continuity and bus integrity.
Q: How does the ESB connector configuration affect node setup?
A: The /CU2N option provides the dedicated S9562FA connector units. These must be properly keyed and secured to the rear interface panel to ensure physical stability and reliable data transmission across the ESB bus.
Nuestra línea de producción se paró debido a un monitor Bently Nevada defectuoso. Lo encontramos en stock aquí y lo enviaron por DHL de inmediato. Volvió a funcionar en 48 horas, lo que realmente salvó nuestra planta.
Encontrar módulos nuevos y originales es fundamental para nuestra seguridad. Este equipo entrega componentes de fábrica con certificación completa. Su compromiso de vender únicamente productos nuevos los convierte en nuestro socio de mayor confianza.
Llevamos dos años abasteciendo aquí piezas de Honeywell y Schneider. Todos nuestros envíos llegan perfectamente embalados, con los precintos originales de fábrica intactos. Ofrecemos una comunicación clara y los mejores plazos de entrega del sector.