100 % original. Más de 100 000 piezas en stock. Listas para enviar.

  • es

The Bently Nevada 330400-02-00, also cataloged as the 330400-02-00 Acceleration Transducer, operates as a dedicated hardware component for sensing seismic vibration within industrial monitoring platforms.

Hardware Specifications

Parameter Specification
Model 330400-02-00
Brand Bently Nevada
Origin USA
Weight 1.5 kg
Mounting Thread M8 x 1 integral stud
Agency Approval None
Operating Temp Standard industrial range
Power Consumption Loop-powered via vibration monitor

Eddy-Current Probe and Transducer Signal Validation

The 330400-02-00 transducer utilizes piezoelectric sensing technology to convert mechanical acceleration into an electrical signal. Unlike eddy-current probes that require -10 VDC targets for gap voltage validation, this accelerometer relies on charge-to-voltage conversion. Proper signal integrity must be maintained by ensuring the accelerometer mounting interface is flat and clear of debris to prevent high-frequency attenuation. Cross-talk suppression is achieved through the use of high-quality shielded cabling to prevent electromagnetic interference from influencing the low-level signal output before it reaches the monitor.

Frequently Asked Questions

Q: Does the 330400-02-00 require a specific mounting torque?

A: Yes. Ensure the transducer is tightened to the manufacturer's specified torque rating to maintain a rigid coupling with the machine casing, preventing resonance errors in the measurement band.

Q: Can this transducer be used in hazardous locations?

A: The -00 suffix indicates no specific agency approval. Do not install this unit in environments classified as explosive or hazardous without appropriate secondary isolation barriers.

Field Installation Guidelines

  1. Ensure the mounting surface is machined flat to a 0.8 micrometer finish or better to ensure maximum frequency response.
  2. Clean the mounting area and apply a thin layer of silicone grease to the base of the transducer to improve high-frequency contact.
  3. Install the sensor using the integrated M8 x 1 stud. Ensure the cable is secured at short intervals to minimize cable whip and strain on the connector.
  4. Verify continuity and shielding termination at the monitor end before powering the system to avoid signal noise.

¿Qué dicen nuestros clientes sobre nosotros?

Translation missing: es.general.search.loading