The Yokogawa CP345-S1 serves as the primary CP345 Processor Module utilized to execute high-speed 32-bit RISC computational logic and real-time loop synchronization across CENTUM VP control platforms.
| Parameter | Specification |
|---|---|
| Model | CP345-S1 |
| Brand | Yokogawa |
| Origin | Japan |
| Weight | 0.64 kg |
| Dimensions | 6.1 cm x 25.0 cm x 26.2 cm |
| Operating Temp | 0 to 55 deg C |
| Power Consumption | Supplied via rack backplane bus |
| Processor Core | 32-bit industrial high-speed RISC processor |
| System Memory | 128 MB DRAM application memory, 128 MB flash logic retention |
| Control Capacity | Up to 1000 independent PID control loops |
| Control Cycle | Minimum 100 ms execution time |
| Redundancy | 1:1 hot standby, bumpless hardware switchover |
| Communication Interfaces | Proprietary FIO backplane bus and dual-redundant V-Net bus |
This control card handles complex multi-variable PID algorithms and sequential interlock protections by integrating directly into the CENTUM VP control station backplane. The internal communication hardware coordinates real-time token passing over the V-Net bus, enabling deterministic synchronization between the controller core, distributed I/O modules, and central operator interfaces. Channel-to-channel isolation features protect the core processing elements from external signal anomalies, preventing fault propagation through the system data paths. Built-in error checking routines validate data packet distribution across the internal bus segments to maintain deterministic control cycles down to 100 ms without cycle jitter.
Q: What mechanisms govern the redundancy switchover time on the CP345-S1 processor module?
A: Dual hot standby processors execute constant data mirroring across a dedicated hardware synchronization link. If the primary processor undergoes a memory exception or hardware failure, the secondary card executes a bumpless switchover within a fraction of the control cycle, maintaining output stability without interrupting active PID loops.
Q: How should a firmware update be conducted within a redundant processor configuration?
A: You must perform the update sequentially. Flash the firmware onto the standby processor card first, initiate an online balance sync to verify logic match, execute a manual switchover to designate the updated card as primary, and then update the secondary hardware module.
Nuestra línea de producción se paró debido a un monitor Bently Nevada defectuoso. Lo encontramos en stock aquí y lo enviaron por DHL de inmediato. Volvió a funcionar en 48 horas, lo que realmente salvó nuestra planta.
Encontrar módulos nuevos y originales es fundamental para nuestra seguridad. Este equipo entrega componentes de fábrica con certificación completa. Su compromiso de vender únicamente productos nuevos los convierte en nuestro socio de mayor confianza.
Llevamos dos años abasteciendo aquí piezas de Honeywell y Schneider. Todos nuestros envíos llegan perfectamente embalados, con los precintos originales de fábrica intactos. Ofrecemos una comunicación clara y los mejores plazos de entrega del sector.