The YOKOGAWA NP1*C, also cataloged as the NP1*C CPU Module, operates as a dedicated hardware component for real-time processing and automation logic execution within FA-MICs and STARDOM platform networks.
The NP1*C designation indicates a core processing unit within the Yokogawa modular controller family. The "NP1" prefix denotes the base series architecture, while the "C" suffix specifies the iteration of the processor and memory subsystem. This module serves as the primary controller for local I/O rack orchestration, facilitating data aggregation from connected digital and analog expansion modules.
| Parameter | Specification |
|---|---|
| Model | NP1*C |
| Brand | YOKOGAWA |
| Origin | Japan |
| Weight | 0.3 kg |
| Dimensions | 130 mm x 35 mm x 100 mm |
| Operating Temp | -10 deg C to 55 deg C |
| Power Consumption | 24 VDC nominal |
| Performance | 32-bit RISC processor, 0.1 ms/1k step cycle time |
The NP1*C manages backplane bus communication velocity to ensure deterministic I/O data acquisition and command execution. The module supports firmware flash compatibility, allowing for updates to the underlying IEC 61131-3 instruction set interpreter. Its architecture facilitates I/O density scaling, supporting up to 2,048 I/O points when configured with appropriate expansion racks. By integrating a watchdog timer and autonomous error logging, the module maintains high-integrity control feedback loops. The system utilizes Ethernet and serial Modbus protocols to establish deterministic networks, enabling seamless integration with plant-wide supervisory control systems.
Q: Does the NP1*C support hot-swapping within the controller rack?
A: No, the CPU module must be powered down by isolating the 24 VDC supply before removal to prevent corruption of the volatile program memory or damage to the backplane communication pins.
Q: How is the execution cycle time impacted by I/O expansion?
A: The cycle time scales linearly with the number of processed I/O points and the complexity of the user program; developers should monitor the scan interval via the engineering tool to ensure process control requirements remain within the deterministic threshold.
Mount the NP1*C into the primary slot of the controller rack, ensuring the module is properly keyed and fully engaged with the backplane connectors. Terminate Ethernet and serial communication cabling according to the plant network topology, ensuring that shielding is grounded at the cabinet entry to prevent electromagnetic noise ingress. Upon initial power-up, verify that the diagnostic LED indicators display a normal operating state and that the firmware version aligns with the loaded control application. Use the Yokogawa engineering suite to perform a final configuration check and verify communication link stability with remote expansion I/O before enabling the controller output logic.
Nuestra línea de producción se paró debido a un monitor Bently Nevada defectuoso. Lo encontramos en stock aquí y lo enviaron por DHL de inmediato. Volvió a funcionar en 48 horas, lo que realmente salvó nuestra planta.
Encontrar módulos nuevos y originales es fundamental para nuestra seguridad. Este equipo entrega componentes de fábrica con certificación completa. Su compromiso de vender únicamente productos nuevos los convierte en nuestro socio de mayor confianza.
Llevamos dos años abasteciendo aquí piezas de Honeywell y Schneider. Todos nuestros envíos llegan perfectamente embalados, con los precintos originales de fábrica intactos. Ofrecemos una comunicación clara y los mejores plazos de entrega del sector.