Configured for discrete trip execution and relay contact switching in Speedtronic Mark V control systems, the GE DS200TCRAG1ACC (DS200TCRA Relay Output Board) provides direct physical/electrical execution.
| Parameter | Specification |
|---|---|
| Model | DS200TCRAG1ACC |
| Brand | GE General Electric |
| Origin | USA |
| Weight | 0.95 kg (2.09 lbs) |
| Dimensions | Standard Mark V Board Profile |
| Operating Temp | 0 to 60 deg C |
| Power Consumption | Passive Board (Relay coil drawing < 15.0 W total) |
| Relay Capacity | 30 plug-in electromechanical relays |
| Ribbon Connectors | 4x 34-pin connectors (IDs: JOR, JOS, JOT, JO) |
| Power/Signal Connectors | 4x 12-pin connectors (IDs: JS3, JS4, JS5, JS6) |
| PCB Coating | Normal Conformal Coating |
The DS200TCRAG1ACC routes discrete logic outputs directly from the Mark V central processor rack to drive its 30 plug-in relays. Communication across the multi-pin connectors (JOR, JOS, JOT, and JO) operates on parallel bus traces to maximize backplane bus communication velocity and reduce signal latency during automated trip sequences. Dedicated power inputs via JS3 through JS6 drive coil excitation directly. Board-level firmware flash compatibility is determined by the central Mark V processor, ensuring full backward compatibility across the first two revision levels without onboard EEPROM reprograming requirements.
Q: Can single relays on the DS200TCRAG1ACC be replaced individually if a coil fails?
A: Yes. The board is populated with 30 plug-in relays, allowing individual relay sockets to be serviced without replacing the entire printed circuit board assembly.
Q: Can the DS200TCRAG1ACC be hot-swapped while the turbine control system is active?
A: No. Standard Mark V procedures require removing core power and field power to the relay outputs to prevent unintended trip actuation or backplane voltage transients.
Q: What are the function differences between the 34-pin and 12-pin connectors?
A: The 34-pin connectors (JOR, JOS, JOT, JO) handle logic command routing from the controller cores, while the 12-pin connectors (JS3, JS4, JS5, JS6) carry high-current power and distribution paths for relay coil drive.
Our production line was down due to a faulty Bently Nevada monitor. We found it in stock here and they shipped it via DHL immediately. Back in operation within 48 hours—truly a lifesaver for our plant.
Finding brand new, original modules is critical for our safety. This team delivers factory-fresh components with full certification. Their commitment to only selling new products makes them our most trusted partner.
We have sourced Honeywell and Schneider parts here for two years. Every shipment arrives well-packaged with original factory seals intact. Clear communication and the best lead times in the industry.