100% Genuine. 100,000+ Parts in Stock. Ready to Ship.

  • en

The GE Fanuc IC693BEM331 serves as the primary IC693BEM331 Genius Bus Interface utilized to execute logic-to-bus data translation across Series 90-30 platforms.

Hardware Specifications

Parameter Specification
Model IC693BEM331
Brand GE Fanuc Emerson
Origin United States
Weight 0.40 kg (0.88 lbs)
Dimensions Standard single slot width
Operating Temp Industry standard 0 to 60 deg C (ambient)
Power Consumption < 300 mA at 5 VDC
Voltage Input 5 VDC derived from Series 90-30 backplane
Module Type Genius Bus Interface
Local Visual Diagnostics 2 LEDs (OK and COMM OK)
Maximum Data Buffer 128 bytes of incoming and outgoing data
Node Support Up to 31 maximum I/O devices per bus
Enclosure Rating IP20
Host CPU Compatibility IC693CPU311K, 321K, 331L or later; all versions of IC693CPU313, 323, 340, 341, 350, 351, 352, 360, 363, 364
System Firmware Requirement Firmware version 5.0 or later

Profinet / EtherNet/IP Deterministic Networks and I/O Density Scaling

The module bridges legacy Genius networks to higher automation layers by managing physical link mapping directly on the host backplane. This mapping maintains constant backplane bus communication velocity during system expansion. When integrating with Profinet / EtherNet/IP deterministic networks via master gateways, the module regulates up to 128 bytes of deterministic data packets without overloading CPU task schedules. This architecture maintains structured synchronization across extensive I/O density scaling parameters. It also retains total configuration integrity, provided the host processors fulfill explicit firmware flash compatibility limits of version 5.0 or higher.

Frequently Asked Questions

Q: What is the maximum number of IC693BEM331 controllers that can be installed in a single Series 90-30 chassis?

A: A single Series 90-30 PLC system supports up to 8 Genius Bus Controllers or enhanced Genius communications modules simultaneously, provided the host CPU runs firmware version 5.0 or later.

Q: How are visual diagnostics interpreted through the front panel LEDs?

A: The OK LED remains steadily illuminated following the successful execution of power-up diagnostics. The COMM OK LED stays on continuously during active network data transmission and blinks to indicate intermittent connections or line errors.

Field Installation Guidelines

  1. Isolate all primary power supplies connected to the Series 90-30 baseplate prior to inserting or removing the bus controller module.
  2. Align the board with the structural card guides of the baseplate slot and seat the module firmly until the rear connector latches with the backplane bus tracks.
  3. Terminate all Genius network trunk wiring onto the terminal block using high-grade shielded twisted-pair cables to minimize signal attenuation and common-mode noise.
  4. Ground the communication cable shield directly to the dedicated enclosure ground bar; avoid mixing field network signaling cables with high-voltage AC actuator conduits inside the panel wireways.

What's clients say about us

Translation missing: en.general.search.loading