The Yokogawa ANR10D-420/ATDOC/NDEL, also cataloged as the ANR10D Node Interface Unit, operates as a dedicated hardware component for dual-redundant ER bus communication within CENTUM VP platforms.
| Option Code / Suffix | Structural Specification | Functional Description |
|---|---|---|
| ANR10D | Base Module Model | Node Interface Unit for CENTUM VP System Expansion |
| -420 | Power Supply Specification | Dual 100 to 120 VAC and 24 VDC Power Input Selection |
| ** /ATDOC** | Terminal Option | ATDOC Enhanced Electrical Connection and Diagnostics |
| ** /NDEL** | Mounting Option | Standard 19-Inch Rack Mount Assembly Configuration |
| Parameter | Specification |
|---|---|
| Model | ANR10D-420/ATDOC/NDEL |
| Brand | Yokogawa |
| Origin | Japan |
| Weight | 4.54 kg (10 lbs) |
| Dimensions | 438 mm x 133 mm x 425 mm |
| Operating Temp | -20 to +70 deg C |
| Power Consumption | 200 VA / 5.5 A at 24 VDC |
| Module Type | Node Interface Unit |
| Network Protocol | Dual-redundant ER Bus Protocol |
| Mounting Type | 19-inch Rack Mounting (M5 x 4 screws) |
| Power Supply Options | 100-120 VAC / 24 VDC |
| Ingress Protection | IP67 Rated Enclosure |
The node interface unit manages high-density signal transfer across dual-redundant ER bus channels while maintaining galvanic isolation between local logic circuits and remote I/O field lines. The system architecture supports pass-through digital communication for 4-20 mA HART loop protocol instruments, allowing field device diagnostics and variable monitoring to execute concurrently with analog sampling. Channel-to-channel isolation limits common-mode noise transfer, preserving cold junction compensation (CJC) accuracy when thermocouple signal cards reside within the node enclosure.
Q: What mounting hardware is required to maintain cabinet isolation for the 19-inch rack unit?
A: Fasten the unit into the standard 19-inch rack frame using four M5 mounting screws fitted with the supplied isolation bushes. These insulating bushes isolate the chassis ground from the cabinet rack frame to prevent parasitic ground loops.
Q: How does the unit operate when configured for dual power supplies?
A: The internal power architecture accepts both 100-120 VAC and 24 VDC inputs across redundant supply rails. If one supply rail fails or experiences a voltage drop, the secondary supply seamlessly maintains full load current without interrupting node communication.
Mount the unit horizontally into the 19-inch rack chassis using M5 hardware fitted with insulation washers to preserve ground isolation. Connect both ER bus communication cables to the designated primary and secondary ports, verifying that cable bend radii meet standard manufacturer limits. Ground the enclosure using a dedicated copper grounding strap connected directly to the central cabinet protective earth (PE) busbar. Ensure field I/O wiring carrying 4-20 mA HART signals is physically segregated from AC power distribution lines to prevent electromagnetic induction.
تعطل خط إنتاجنا بسبب عطل في شاشة بنتلي نيفادا. وجدناها متوفرة لدينا في المخزون، وقاموا بشحنها إلينا عبر DHL على الفور. عاد خط الإنتاج للعمل في غضون 48 ساعة - لقد أنقذت هذه الشاشة مصنعنا حقًا.
يُعدّ العثور على وحدات أصلية جديدة تمامًا أمرًا بالغ الأهمية لسلامتنا. يُقدّم هذا الفريق مكونات جديدة من المصنع مع شهادات اعتماد كاملة. والتزامهم ببيع المنتجات الجديدة فقط يجعلهم شريكنا الأكثر ثقة.
نستورد قطع غيار هانيويل وشنايدر من هنا منذ عامين. تصل كل شحنة مغلفة بإحكام مع الحفاظ على أختام المصنع الأصلية. نتميز بالتواصل الواضح وأفضل أوقات التسليم في هذا المجال.