100% Genuine. 100,000+ Parts in Stock. Ready to Ship.

  • en

The GE Fanuc DS200PTBAG1AEC, also cataloged as the DS200PTBA Power Terminal Board, operates as a dedicated hardware component for power distribution signal termination within Mark V Turbine Control System platforms.

Hardware Specifications

Parameter Specification
Model DS200PTBAG1AEC
Brand GE Fanuc
Origin USA
Weight 1.15 lbs
Operating Temp 0 to 60 deg C
Power Consumption Passive Power Distribution Terminal Module
Board Type Power Terminal Board (PTBA)
System Platform Mark V Turbine Control System
Hardware Revision Group 1 (G1), Revision AEC

Backplane Bus Communication & Firmware Compatibility

The GE Fanuc DS200PTBAG1AEC serves as a hardware power interface, directing incoming operational power rails to internal backplane busses and adjacent card racks. High backplane bus communication velocity across connected control modules is preserved by maintaining regulated DC power buses without voltage drop. Solid-state design characteristics ensure full firmware flash compatibility and uninterrupted power delivery across active and redundant Mark V control core configurations.

Frequently Asked Questions

Q: How is the DS200PTBAG1AEC integrated into the Mark V power distribution topology?

A: The board terminates incoming system power supplies and distributes control-level DC voltages directly to adjacent control boards and backplane buses within the Mark V rack assembly.

Q: Does the DS200PTBAG1AEC require software or firmware configuration before replacement?

A: No, as a hardware-level power terminal interface board, it operates passively without requiring firmware flashing, provided all physical jumpers and terminal connections match the existing unit.

Q: What are the primary installation precautions for this module?

A: System power must be de-energized before mounting or wiring the board, and static dissipation precautions must be observed during handling to protect connected backplane logic.

Field Installation Guidelines

  1. Power Isolation: De-energize all primary input power feeds to the turbine control cabinet before servicing or replacing the board.
  2. ESD Protection: Equip technicians with grounded ESD wrist straps prior to unpacking or touching the PCB assembly.
  3. Mounting: Securely mount the board to the rack standoffs using standard hardware, ensuring no conductive debris contacts the trace lines.
  4. Wiring & Shielding: Terminate power leads tightly to designated screw terminals. Ensure field signal cables remain isolated from high-current power cables, landing shields at the enclosure earth ground bar.

What's clients say about us

Translation missing: en.general.search.loading