100% Genuine. 100,000+ Parts in Stock. Ready to Ship.

  • en

Configured for high-voltage line monitoring and transient attenuation in GE Speedtronic Mark V platforms, the GE DS200LPPAG1AAA (DS200LPPA Line Protection Panel Board) provides direct physical/electrical execution.

Hardware Specifications

Parameter Specification
Model DS200LPPAG1AAA
Brand GE General Electric
Origin USA
Weight 0.40 kg
Dimensions 15.2 cm x 12.7 cm
Operating Temp 0 to 60 deg C
Power Consumption 200-600 VAC (System Input Voltage)
System Series Mark V
Assembly Revision Group G1
Manual Reference GEI-100178
Terminal Interfaces 2 Terminal blocks (3 terminals each)
Configuration Jumpers 7 Hardware Jumpers (JP1 through JP7)
Onboard Diagnostics Diagnostic test points and onboard menu interface

Firmware Flash Compatibility and Deterministic Signal Routing

The DS200LPPAG1AAA incorporates discrete hardware jump points to configure analog current sensing, grounding resistor bridges, and line surge indication circuits. Onboard jumpers JP1 through JP3 manage AC line filter blown fuse indications, while JP4 and JP7 configure AC/DC ground current sensing paths. The hardware execution relies on passive network attenuation and direct signal scaling, preserving total compatibility across all Mark V control system revisions. By executing line protection directly at the physical hardware layer, the module offloads transient processing from the central processing units, ensuring overall system backplane bus communication velocity and deterministic response times during power disturbance events.

Frequently Asked Questions

Q: How does the DS200LPPAG1AAA interface with external laptops for diagnostics?

A: The board platform provides a serial communications menu interface that allows service technicians to upload diagnostic reports, modify drive configuration parameters, and download operating logs directly to a connected field computer.

Q: Can the jumper settings on JP1 through JP7 be changed while the board is energized?

A: No. Power must be completely isolated from the system input voltage rails (200-600 VAC) prior to reconfiguring any jumpers to prevent arc flash hazards and potential control circuit disruption.

Field Installation Guidelines

  1. Isolate and lock out all AC input voltage lines (200-600 VAC) feeding the equipment cabinet before servicing or mounting the card.
  2. Secure the DS200LPPAG1AAA to its designated standoff mounts on the primary drive assembly using standard panel hardware.
  3. Verify the position of jumpers JP1 through JP7 against system schematic requirements prior to terminating field wiring.
  4. Connect field signaling wires to the two 3-position terminal blocks, ensuring strict adherence to phase labeling and torque values.
  5. Attach a calibrated laptop to the serial service port to verify parameter alignment and run internal diagnostic routines prior to re-energizing the main power circuit.

What's clients say about us

Translation missing: en.general.search.loading