100% Genuine. 100,000+ Parts in Stock. Ready to Ship.

  • en

Yokogawa YCB301-C300 ESB Bus Cable

The Yokogawa YCB301-C300, also cataloged as the YCB301 ESB Bus Cable (36-36 pins), operates as a dedicated hardware component for high-speed inter-node data transmission and signal routing within CENTUM VP control systems.

Suffix Breakdown & Model Matrix

Code Option / Specification Description
YCB301 Base Model ESB Bus Cable (36-36 pins)
-C300 Cable Length Cable length 3 m

Hardware Specifications

Parameter Specification
Model YCB301-C300
Brand Yokogawa
Origin Japan
Weight 0.8 kg (Net), 1.5 kg (Shipping)
Dimensions Cable length 3 m (36-pin to 36-pin connector)
Operating Temp -20 to +60 deg C
Power Consumption Passive bus component
Cable Type ESB Bus Cable (36-36 pins)
Connector Type Dual 36-pin high-density connectors
Bus Protocol ESB bus communication
Environmental Limits Humidity 5 to 95% RH (non-condensing)
System Platform CENTUM VP / ProSafe-RS

Process Control and DCS Connectivity

Designed for high-integrity inter-unit interconnectivity, the YCB301-C300 cable bridges communication nodes across the ESB bus architecture. It transfers high-frequency digital control signals and process variables between the Field Control Unit (FCU) and system extension nodes. Integrated shielding ensures comprehensive channel-to-channel isolation and EMI suppression, preventing ground loops and signal corruption across distributed process control loops, including 4-20 mA HART loop protocol interfaces.

Frequently Asked Questions

Q: What physical connectors are integrated on the YCB301-C300 cable?

A: The cable is terminated with dual 36-pin high-density male connectors designed for direct engagement with ESB bus interface ports.

Q: Can the YCB301-C300 cable be hot-swapped during active DCS operation?

A: Disconnecting the primary ESB bus cable during operation interrupts node communication; redundant bus configurations must be active and validated before replacing an individual cable line.

Field Installation Guidelines

Inspect the 36-pin connectors on the YCB301-C300 for bent pins or debris prior to installation. Align the connector squarely with the ESB bus interface port on the module or base unit, then press firmly until fully seated. Tighten the integral side locking screws using a standard screwdriver to ensure solid electrical grounding and prevent accidental disconnection due to field vibration. Route the 3 m cable away from heavy AC power wiring, variable frequency drives, and high-voltage conduits to eliminate cross-talk and electromagnetic interference. Maintain minimum bending radius limits along the cable run to avoid internal conductor stress.

What's clients say about us

Translation missing: en.general.search.loading