100% Genuine. 100,000+ Parts in Stock. Ready to Ship.

  • en

Siemens A5E00185061 MicroSAM Solenoid Valve

Configured for precise fluid control in MicroSAM process gas chromatograph systems, the Siemens A5E00185061 (A5E00185061 Solenoid Valve) provides direct physical/electrical execution.

Hardware Specifications

Parameter Specification
Model A5E00185061
Brand Siemens
Origin Germany
Weight 0.6 kg
Dimensions 260 mm x 250 mm x 250 mm
Operating Temp Varies by process enclosure specification
Power Consumption Dependent on host MicroSAM system distribution voltages
Operation Type Normally Closed (NC)
Form Factor Compact MicroSAM configuration module
Certifications CE, RoHS

Profinet / EtherNet/IP Deterministic Networks and I/O Density Scaling

The solenoid valve interfaces with the low-level digital output modules of the analyzer controller. When integrated into distributed processing frameworks, the actuation sequences are managed through high-level PLC architectures, which map field device telemetry across Profinet / EtherNet/IP deterministic networks. This synchronized bus scheduling allows for precise sample injection and column switching intervals while adapting to strict I/O density scaling profiles within compressed analytical enclosures.

Frequently Asked Questions

Q: Can the A5E00185061 solenoid valve be serviced or replaced while the fluid path is under operating pressure?

A: No. The internal fluid line must be completely depressurized and isolated before removing or installing the valve assembly to prevent hazardous gas release or terminal damage.

Q: Is this valve component compatible with standard low-voltage DC logic circuits?

A: The physical coil requirements conform to the integrated distribution buses of the host Siemens analytical subrack. Voltage and current consumption parameters must match the specific carrier board slot properties to ensure complete valve state execution.

Field Installation Guidelines

  • Mechanical Seat Alignment: Position the compact valve within the specified MicroSAM manifold interface, verifying that all integrated sealing gaskets are aligned before securing the retaining screws.
  • Electrical Connection: Terminate the lead wires into the designated system terminal blocks, ensuring proper strain relief to prevent wire fatigue from mechanical vibration.
  • Leak Detection Protocol: Execute a pneumatic leak test across all manifold connection points before restoring full process fluid pressure to the analytical system.

What's clients say about us

Translation missing: en.general.search.loading