100% Genuine. 100,000+ Parts in Stock. Ready to Ship.

  • en

Yokogawa PS11*C CENTUM Power Supply Module

Configured for internal bus voltage regulation and backplane energy distribution in Yokogawa DCS platforms, the Yokogawa PS11*C (PS11*C Power Supply Module) provides direct physical and electrical execution of incoming line power transformation to DC operating rails.

Hardware Specifications

Parameter Specification
Model PS11*C
Brand Yokogawa
Origin Japan
Weight 0.5 kg
Dimensions 100 x 100 x 50 mm
Operating Temp -10 to +60 deg C
Power Consumption 120 W (rated output capability)
Module Type Regulated Power Supply Module
Input Voltage 100-240 VAC (50/60 Hz)
Output Voltage 24 VDC / 5 VDC
Output Current 5 A (24 VDC) / 10 A (5 VDC)
Protection Modes Overvoltage, overcurrent, and thermal shutdown

Process Control Isolation and HART Loop Integrity

The module incorporates high-density input-to-output galvanic isolation rated to 1500 VAC to prevent line noise and ground potential loops from coupling into sensitive 4-20 mA HART analog control loops. By delivering low-ripple regulated DC power directly across the rack backplane, the unit preserves signal signal-to-noise ratios required for accurate field transmitter sampling and cold junction compensation calculations in dense temperature input modules.

Frequently Asked Questions

Q: How does the power supply handle dual-redundant configurations within a node rack?

A: When two PS11*C modules occupy designated redundant power slots on the backplane, internal diode-ORing logic balances current distribution under normal operation. If one power supply unit fails or drops voltage, the secondary unit assumes the full 120 W load without interrupting system processing.

Q: What thermal clearance parameters must be maintained during installation?

A: Forced convection or passive dissipation relies on unrestricted airflow through the top and bottom chassis vents. Maintain a minimum vertical clearance of 50 mm above and below the module carrier to ensure operating temperatures do not exceed the +60 deg C rating and trigger thermal protection logic.

Field Installation Guidelines

Verify that main AC source power is de-energized and locked out prior to landing physical conductor wires on the terminal block connections. Align the module card guides precisely with the chassis sub-rack slots and push firm against the backplane until the retention screws align with the mounting rail. Ensure the protective earth (PE) grounding conductor connects directly to the rack ground busbar using a low-impedance copper strap to optimize noise immunity. Route field supply cables separately from sensitive high-speed digital communications or low-level instrument signals to avoid electromagnetic interference.

What's clients say about us

Translation missing: en.general.search.loading